How much is the secondary construction column pump | Having high-quality concrete engineering see here


Unintentionally, I saw Mrs Thatcher said this: money is not an end, but only a means to achieve it. This sentence made me think of solving doubts for those friends who consulted me and how much the secondary structure column pump cost. Luke Heavy Industry secondary structure column pump 10 model, head 10 meters high, the manufacturer's uniform ex-factory price of 28,000 yuan, please contact customer service for details of distribution accessories. How can high-quality concrete projects be owned? How much is the secondary construction column pump is a means for us to obtain high-quality concrete engineering. You can get good results through it.

中国五金商机网

Luke Heavy Industry Equipment Construction Site

Of course, if you want to have a high-quality concrete project, there are several steps that deserve our attention:

1. Conveying process

The secondary construction column pump should do the following when pumping concrete: 1) Keep the level when arranging the transmission pipeline, and the slope when turning is as small as possible. In order to prevent air from entering and blocking, ensure that the joints should be tight and the pipeline should be inclined downward; 2) Lubricate the inner wall of the conveying pipe with an appropriate amount of cement slurry or cement mortar with the same composition as the concrete, which is the basis for pumping concrete; During the delivery process, there should be enough concrete in the hopper to ensure the continuity of construction. 4) If the intermittent pumping time exceeds 45 min; or the concrete is separated, immediately flush the remaining concrete in the pipe with pressure water or other methods.

2. Pouring engineering

When using the secondary structure column pump to cast the secondary structure, the drainage and waterproof measures must be taken first, and the accumulated water should not be stored. When pouring, the free height of concrete falling from a height should not exceed 2m. When the pouring height exceeds 3m, string concrete, slide pipes or vibrating slide pipes shall be used to drop the concrete. Concrete pouring should be carried out continuously to avoid cold joints. The location of the construction joint should be placed at a position where the structure is under less shear and is convenient for construction. Its specific location should be determined in accordance with relevant regulations before construction. When concrete continues to be poured at the construction joints, it shall be treated accordingly.

3. Maintenance process

After the concrete is poured, the maintenance work is also very important. Carry out maintenance work for carpenters, rebar workers and other operators, and conduct regular inspections. When it is found that the concrete is deformed or displaced, take measures to deal with it in time. In winter construction, concrete test blocks are reserved according to regulations, covering and watering curing the concrete that has been poured.

中国五金商机网

Luke Heavy Industry Equipment Construction Site

Luke Heavy Industry has always been adhering to helping the society to change the construction method as the core, and is committed to the development, production, and sales of secondary structure pumps, secondary structure pumps, and secondary structure column pumps. How much is it to pour 5 cubic stone concrete in one hour, how much is the secondary structure column pump, consult Luke customer service, 2 hours response after-sales, free on-site installation and commissioning, free technical training, the company has won praise and trust from many companies with high-quality after-sales service .
'How much is the secondary construction column pump | have high-quality concrete engineering look here

Upvc Middle Check Valve

Check Valve,Middle Check Valve,Upvc Middle Check Valve,Pvc Swing Check Valve Thread

Zhejiang Huangyan Minghua Plastic Pipe Fitting CO.,LTD , https://www.pipefitting-mh.com