Many people think that after the house is completed, it may not be strictly required in the completion acceptance process, or it may not be accepted after passing the quality inspection station acceptance. In fact, such an idea is wrong. If the house has a problem after acceptance, it will not be easy for the landlord to seek responsibility. Therefore, the acceptance of the house decoration is indispensable, then how to check the house ? What are the precautions for acceptance of the house ?
Eight considerations for housing acceptance
First, a detailed inspection of the quality of the house, including doors and windows, balconies and other parts of the phenomenon of cracking; due to the new house empty time is longer, there will be some dust and construction waste in the doors and windows track, so must not be very impulsive, with a brute force pull Doors and windows, when you feel a sense of obstruction, take a closer look and you can read it clearly with a broom.
Second, check the flatness of the wall, whether the water seepage, whether there are cracks, especially to see if there are some wall traces of water, especially some gables, kitchen tops, exterior walls and other places, if any, be sure to find out the reasons as soon as possible .
Third, carefully check the ground shell cracks. If there is an empty drum, it must be instructed to accompany the property personnel to repair it as soon as possible, otherwise it will be easy to break through the floor during the renovation and hinder the relationship between the neighbors. More than 2-3 available tools for gimmicks and feelers.
Fourth, the smooth flow of utilities and whether they can be used normally. Open up the tap to check for leaks, try to make the flow bigger and anxious. Let's take a look at the water pressure and try the drainage speed. In general, the new house will be equipped with a simple faucet for the owner, using a multimeter to measure whether all the weak and strong electricity flows.
V. Acceptance of water conditions, wood gallery furniture Xiao Bian first use basin water, and then to the various water irrigation, respectively, basin water, bathtub water, toilet water, kitchen and health and balcony floor drain, etc., basically every next The water outlet should be poured into two basins of water, and the sound and surface water should be heard. After doing this, make sure that there is no problem. We must use a plastic bag to cover the nozzle as soon as possible and then affix it. The water that flows through the floor drains needs to be tamped.
Sixth, acceptance of the ground water situation. Water in the toilet, shallow shallow on the line (about 50px high). Afterwards, the owners who are downstairs are expected to check the ceiling of their home toilet after 24 hours. After all the water is used up, the water meter should be turned on again to see the number of the water meter and record it. At the same time, the meter number should be recorded.
VII. Check whether there are omissions, brands, and quantities in the facilities and equipment indicated on the sales contract. Generally, there should be no major problems in this respect, but it is really necessary to verify it carefully.
8. Measure the height of the building, use a 5 meter tape, sample the data source location and specific data, preferably the water meter, meter number, height, toilet pit distance, bathtub length and width, shower room size, ceiling The heights are recorded in a small notebook of their own. At the same time, some data and questions on the acceptance of the house are written on the paper provided by the property company.
Acceptance of the house after the completion of the renovation is the most important, because in this link you can clearly understand the details of the house, but also for the entire renovation process to do a good finishing touches. Through the above knowledge of the acceptance of the house , I hope everyone can understand how to check the house.
related articles
Aijia Furniture reminds you about the decoration of small-sized houses
How to choose furniture coordinated with house space?
6 kinds of bad feng shui houses that can't be bought
Two issues that need special attention in the early stage of house decoration
The steel pipe pillar structure is simple, the construction is convenient, the cost is reduced, and the work cycle is shortened. The lower steel pipe and the upper steel pipe are provided. The lower steel pipe is provided with a support base plate at a certain depth from the upper end. The diameter of the upper steel pipe is smaller than the diameter of the lower steel pipe.
Steel Pipe,Steel Pipe For Subway,Carbon Steel Pipe,Construction Steel Pipe
Anshan Lijian Engineering Group Co. LTD , https://www.lijianformwork.com